The Federal Government has confirmed there will be a full closure of the Ijora Bridge in Lagos from April 27 for critical repair works.
The Federal Controller of Works, Mrs Olukorede Kesha, disclosed this during an inspection of the bridge on Monday.
She said that the bridge connecting Ijora Causeway to Apapa needed comprehensive repairs, especially replacement of defective bearings beneath the deck.
Mrs Kesha said: “This bridge has been awarded for some time now in different phases.
“We are now at the final phase, which involves lifting the entire bridge deck to change the faulty bearings beneath.
“A lot of the bearings are defective, and approximately 50 of them will be replaced across three sections.”
Mrs Kesha emphasised the importance of the Ijora Bridge as a major route leading to Apapa, home to two of Nigeria’s busiest ports, Tincan and Apapa ports.
She acknowledged the disruption the closure would cause but said that it was necessary for the safety of commuters and to prevent further deterioration.
The Nation/Adetutu Adetule
Subscribe to our Telegram and YouTube Channels, and also join our WhatsApp Update Group.